SITTARD/HEERLEN – Due to engineering works by ProRail, no trains will run between Heerlen and Sittard from Saturday, 28 November through Monday, 30 November, and on Saturday, 5 December and Sunday, 6 December.
Express buses will be deployed by NS. Arriva's local trains will also be suspended. Passengers can use replacement bus services instead.
During the works, NS advises passengers to plan their journeys in advance using the
NS app or the
NS website.
Work on tracks, level crossings and escalators
Along the Sittard–Heerlen route, ProRail will renew sections of the railway track at various locations, including the ballast and fastening. They will also renovate several level crossings and part of the overhead power lines.
The works will take place from Friday, 27 November at 23:00 until Wednesday, 2 December at 7:00, and from Saturday, 5 December at 1:15 until Monday, 7 December at 3:15 AM. No trains will run during these periods, allowing the work to be carried out continuously.
Level crossings
The following level crossings will be renovated. Work will take place from Saturday, 28 November at 1:00 until Tuesday, 1 December at 5:00. During this period, these crossings will be closed to all traffic.
Diversions will be signposted.
- Sittard: Geuweg. Please note: work at this crossing will take place from Friday, 27 November (23:00) until Wednesday, 2 December (7:00).
- Geleen: Pedestrian crossing at Geleen Oost station.
- Geleen: Danikerstraat.
- Geleen: Ten Eysden.
- Geleen: Driepoelpad.
- Wijnandsrade: Laar.
- Hoensbroek: Montfortstraat.
- Hoensbroek: Pedestrian crossing at Hoensbroek station.
Escalators at Sittard station
From 16 November at 17:00, the escalators at Sittard station are being replaced. The existing escalators have reached the end of their service life and will be replaced. Passengers will be able to use the escalators again from early February.
During the weekend of 28 November, the lift providing access to and from the platforms will be out of service due to the escalator replacement work. Passengers who rely on the lift will receive on-site assistance.
Heerlen railway yard
ProRail will also carry out work at the Heerlen railway yard, covering the tracks between Looierstraat and Dudoklaan, on the western side of Heerlen station. A number of disused tracks and switches in the railway yard will be removed, and the overhead line support structures will be adjusted where necessary. In addition, new facilities will be constructed at the railway yard for servicing and cleaning Arriva and NS trains.
These works will take place from Saturday, 21 November until Thursday, 24 December. Most of the work will be carried out between 6:00 and 23:00. However, from Friday, 27 November through Monday, 7 December, work will continue around the clock.
♦♦♦
Als extra service worden, in samenwerking met Expats and
Locals Limburg, nieuwsberichten
vertaald voor de vele expats in de gemeente. As an extra service, in cooperation
with Expats and Locals Limburg, local news is being translated for
the many expats living in Sittard-Geleen and surroundings. ♦♦♦
·
Stay informed via
Facebook or via the English newsletter, subscribe at the bottom of this
page.
·
Submit a local (press) release or event? You can do so via
[email protected] .
Want to advertise on
Sittard-Geleen.nieuws.nl? Visitor numbers continue to rise, which is
good for the visibility of our advertisers, among other things. Do you want to
increase your brand awareness?
We are happy to help you think
about how to spend your advertising euros as optimally as possible. By
advertising locally on Sittard-Geleen Nieuws at a competitive price! Contact
Paul Storms by phone: 06-22543972 or by email:
[email protected] .
The news desk can be reached
via
[email protected].